ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT
- WML Consulting Engineers
- Sep 26, 2023
- 1 min read
Client: Main Roads Western Australia
Project Value: $259m
Year: 2018 - 2021
WML completed the pavement and surfacing design for this major MRWA project in the Perth Metropolitan Region.
The project is situated in a busy, high-traffic environment and primarily consisted of the design of Full Depth Asphalt Pavements. WML was also retained to provide ongoing construction support throughout the entire construction timeline.









Comments