top of page
WML logo horizontal

ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT

  • WML Consulting Engineers
  • Sep 26, 2023
  • 1 min read

Project Value: $259m

Year: 2018 - 2021


WML completed the pavement and surfacing design for this major MRWA project in the Perth Metropolitan Region.


The project is situated in a busy, high-traffic environment and primarily consisted of the design of Full Depth Asphalt Pavements. WML was also retained to provide ongoing construction support throughout the entire construction timeline.


ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT
ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT
ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT
ARMADALE ROAD NORTH LAKE ROAD BRIDGE PROJECT

Comments


bottom of page